ETIHAD POWER SYSTEM 60 MW STEAM TURBINE PLANT

TOTAL LOAD
—MW
—
—
24-HOUR ENERGY
—MWh
—
MONTHLY EST.
—MWh
—
DEMAND FACTOR
—
—
SAVINGS IDENTIFIED
—MW
—

LEADERBOARD

Open the mobile version ›

TOTAL FEEDER LOAD 17.21 MW
24-HOUR ENERGY 419 MWh
MONTHLY ESTIMATE 12,581 MWh
EQUIPMENT NAME DESCRIPTION RUN HOURS AVG LOAD (kW) · SHARE DAILY ENERGY (kWh) REMARKS
/ENERGY FLOW

ENERGY FLOW — WHERE THE 60 MW GOES

Band thickness = megawatts. Click any band to drill into it.

/SAVINGS

SAVINGS

Identified load reductions, grouped by feeder, and the capacity they would free at the generator. Click any item to open it.

/P.F. & KVA

POWER FACTOR & KVA

Uncorrected vs corrected (with PFC capacitor banks), per transformer and at the grid. One-time readings taken as averages.

BASIS & ASSUMPTIONS